On Thursday March 12th, 2009 around 1200 hours, companies from the 8th Battalion responded to the area Gallagher and Davidson for a reported dwelling fire. On arrival of E56 they found the fire on Charest between Lawley and Davison and reported a 2 family flat full involved. They requested the 2nd arriving Engine dump their monitor on the fire. Crew attempted an interior attack but where pulled out by C8 when the roof showed signs of failure. L30’s water tower was put into operation and the roof of the structure collapsed into the second floor. C8 requested an additional company for RIT, L18 was dispatched as RIT. Companies work for over an hour before this fire was declared under control. E25/44/56, L18/30, S5, C8 all worked at this fire.
DFD Box Charest and Davidson 3-12-09_01
DFD Box Charest and Davidson 3-12-09_01
Camera: Nikon Corporation (Nikon D300) |
Original size: 2848px x 4288px |
Current: 199px x 300px |
Other sizes:
Small
•
M •
L •
O |